Sam is coming down the home stretch on a big railing project hes been working on for a while now. The first section went in before the holidays and the second section went in yesterday ... The last section that goes down the steps in the photo above has been templated , the parts are completed, and welding on that section will start tomorrow ... Click the photos to enlarge them.
The first step was to make a full size template on site.
The post fabrication is sort of technical and fussy but very effective and rigid when installed .
Then back to the fabrication department above ..
There was a little on site welding ...
And then, back to the shop for the last section that goes down the steps in the photo above ....
The main balcony section is a long one ..... 20 or so and solid as a rock ...
Looks good from below, too ...